New Airport Business Center & Aircraft Apron Facts

Building:

  • 7,500 square feet. The former office building was less than 2,000 square feet.
  • Beautiful lobby and reception area furnished by Herman Miller.
  • Main conference room furnished by Haworth, including glass walls.
  • Pilot’s lounge furnished by Haworth, including glass walls.
  • East conference room furnished by Herman Miller.
  • Airport Authority staff work areas furnished by Herman Miller.
  • FBO line service and charter offices furnished by Herman Miller.
  • FBO other offices furnished by Haworth, including glass walls.
  • Windows along the south and west side of the building have the Pleotint glass.
  • Contractor for the building: CL Construction of Holland.
  • Contractor for apron and site work: Millbocker & Sons.
  • postcard-final-costs

    Cost:

  • Total cost: $6.8 million
  • Airport Business Center: $2.5 million
  • Remainder of cost relates to apron, site work, property acquisition, environmental, etc.
  • Funding:

  • Federal Aviation Administration: $2,372,885 (35%)
  • MDOT/Aeronautics: $1.8 million (26%)
  • Michigan Economic Development Corporation: $1,300,000 (19%)
  • Private contributions (including furniture): $567,615 (8%)
  • Airport Authority savings over the years: $773,450 (11%)
  • The project has been constructed without debt obligations.
  • Other:

  • Snowmelt installed in the sidewalk leading from the parking lot to the front entrance; and in the stairs and ramp leading from the apron to the airside doors. The cost for this system ($180,000) was funded by the Prince and DeVos families.
  • Conference rooms have already been used by air travelers and community organizations.
  • Recent & Related

    WMRA Crack Sealant Maintenance

    Crack Sealant is an important part of maintaining the overall pavement surface at West Michigan Regional Airport. (Check out the video that follows.) Over time, pavement will deteriorate due to weather and stress. Crack Sealant is used to help get many more years...

    read more

    Stop by and visit the new WMRA terminal!

    Completed in 2017, the new 7,500 square foot building hosts a beautiful lobby and reception area with all furnishings donated by Herman Miller and Haworth. The main conference room is a great place that can be reserved by local businesses and organizations for...

    read more

    DEMOLITION DAY

    Because of the West Michigan Regional Airport's growth, a much larger and newer facility that reflected the economic health and vitality of the area replaced the former airport terminal building at the entrance of Geurink Boulevard. Ron and Linda Ludema used the ranch...

    read more