WEEK 2 SURVEYING AND SCRAPING
WEEK 2: August 24-28, 2015 Today the surveyors began staking a ditch that will be dug out and become the water management system on the site. The water on the site will drain into the ditch, be directed to a holding detention pond and eventually to the main ditch that will carry the water […]